Wednesday, January 28, 2009
Tower House in progress
The 1/16 inch birch plywood shell goes up first, attached to the base. I decided to flip the door and window placement on the front and made the sides 1/16" deeper. The inside walls and floors are finished, and fireplaces and windows installed. The gabled structure on the roof is a separate piece, and not in the picture.
Tower House in progress
Welcome
Welcome to the Miniature Miniatures blog! Check back often for a look at finished pieces and works in progress.
You can see my work in person at upcoming miniature shows: Chicago International 2009 and Philadelphia Miniaturia 2009.
You can see my work in person at upcoming miniature shows: Chicago International 2009 and Philadelphia Miniaturia 2009.
Subscribe to:
Posts (Atom)